2304CP-001-01S1 |
Hall of Records Roof and Fire Protection DM Repairs |
$84,176.47 |
Hall of Records Roof and Fire Protection DM Repairs |
2304CP-004-01S2 |
Agricultural Commissioner/Weights and Measures Building B Renovation - Lab Revision |
$82,482.58 |
Replace an existing exhaust fan, provide drywall, drain pan, and two arm exhaust fans. |
2304CP-006-01S1 |
MLK CFWC Medication Room HVAC Project: Access Panel and Flooring Correction |
$14,177.52 |
Provide (2) access panels for future maintenance of HVAC and plumbing fixtures Remove and replace approximately 60 sq ft of drywall to install new HVAC and plumbing pipes Relocate existing heat recovery unit to allow access to new refrigerant lines Remove and repair 2nd floor vinyl flooring in (3) locations |
2304CP-007-01B1 |
OVMC SB1953 Compliance - NPC3 Add Wall Reinforcements |
$213,770.92 |
OVMC SB1953 Compliance? NPC3 Add Wall Reinforcement |
2304CP-007-02S1 |
OVMC SB1953 Compliance - Anchorage for Added Equipment |
$81,518.84 |
The scope of work includes, but not limited to, the following items: Provide labor, equipment, and material for seismic anchorage for added equipment located in 1st floor Clinical Lab and 2nd floor OR rooms. Reference: ACD 002, ACD 003, |
2304CP-009-01B1 |
HUCLA New Grossing Stations - Air Readings |
$37,737.48 |
|
2304CP-011-01S1 |
HOR Fire Alarm and Roofing Deferred Maintenance Repairs |
$120,981.27 |
|